We discovered that the foul drain from the property above the school ran under the school building. Using CCTV we also identified that the drain was Pitch Fibre and was reaching the end of its useful life. We determined that the best option would be to excavate and install a new drain using 100mm UPVC. The red line shows the run of the new drain on completion of the operation.